![]() |
Image of the Google SketchUp Model |
![]() |
Started collecting pallets and rocks |
![]() |
spreading out the rocks |
![]() |
The first day of foundation wall |
![]() |
The corner at the right was the shallowest and everything after that took more rocks and a lot more time |
![]() |
That's me working |
![]() |
Trying to bring up the wall to the right level |
![]() |
First corner finished |
![]() |
This process takes a lot longer than just pouring a cement foundation |
![]() |
I spent hours doing this. After sitting like this for a few hours , It would take me several minutes before I could stand up straight |
![]() |
Almost done with the foundation |
![]() |
A concrete slab to level off the top |
Its going to come out great, I can already sense it.
ReplyDelete-Bronx Shower Doors